Chennai Metrowater will deploy additional sewer lorries and dewatering pumpsets to manage the expected surge in sewage load during the upcoming northeast monsoon. The water agency has also expedited desilting of the sewer network.
To ensure uninterrupted operation of 394 sewage pumping stations, Metrowater has raised key infrastructure, including panel boards, above the maximum flood level.
About 100 sewer lorries from o
Continue Reading on The Hindu
This preview shows approximately 15% of the article. Read the full story on the publisher's website to support quality journalism.